Wait what ? Where is this info ?
Ahhhh thank you good to know
I guess until Batch 16 is shipped, the backlog of the parts that aren’t available right now are resolved.
My Configuration
System: Ryzen™ 7 7840HS
Expansion Bay Module: Graphics Module (AMD Radeon™ RX 7700S)
Expansion Bay: Expansion Bay Shell
Macropad: RGB Macropad Module
Laptop Bezel: Framework Laptop 16 Bezel - Black
Keyboard: International English - Linux
Power Adapter Region: EU / KR
Expansion Cards
Audio
DisplayPort (2nd Gen)
Ethernet
HDMI (3rd Gen)
2 x USB-A
2 x USB-C
Accessories
2 x Extra Spacer: LED Matrix
2 x Extra Spacer: Black
2 x Extra Medium Input Module: Numpad Module
Fellow batch 16 here. Is there anywhere to keep track of which batch is currently shipping? Looking at other threads it seems maybe some of batch 3 is shipping, is that right? Because if so that means we would be lucky to get our laptops by the fall
8000 series amd processors have been out for a bit now, and 9000 might be by the time we get our batch, making it a pretty bad investment by that time. Not trying to be a negative nancy but I’m concerned
Greetings all, another Batch 16 biatch here Cannot wait to get my grubby hands on it.
My Config
System: Ryzen™ 9 7940HS
Expansion Bay Module: Graphics Module (AMD Radeon™ RX 7700S)
Keyboard: British English
Numpad: Numpad Module
Laptop Bezel: Framework Laptop 16 Bezel - Orange
Power Adapter Region: UK / IE / HK / SG
USB-C Expansion Card
USB-A Expansion Card x2
HDMI (3rd Gen) Expansion Card
DisplayPort (2nd Gen) Expansion Card
Ethernet Expansion Card
MicroSD Expansion Card
Although Batch 16 says it is Q2 when we placed an order. They started Batch 1 about 2 months later, so realistically I am thinking I might get it by the end of Q3. If it arrives before then, so great, but I am setting my own expectations at end of Q3.
There are two ways I see it, either they ramp up production over the next weeks and they have a higher output soon or they continue as is (highly unlikely) and they will target late Q2. I am saying this, as they are only having issues with some 3rd party parts and the lunar new year was happening. Without the these “setbacks” they already would be at batch 5 or 6.
The other way to look at it is a continues issue with 3rd party deliverables or similar, then there is a good chance it slips into Q3. I am an optimist and think they surprise us.
Batch 16 gang
Hoping it will come early enough in Q2
Planning to go to Japan at June so would be amazing if it comes in time
Batch 16 fellow “crew” member here!
I was surprised to see that they had shipping slated for Q2!
When I first placed the order, I think the delivery estimate was originally for around November 2024. For the life of me, I can’t remember where I saw that during the ordering process, but that was what was in my head after placing the order. Then when I saw Q2 I got excited! Anything before November is fine by me!!
I think Q3 is a safer estimate, but would LOVE to see it sometime Q2. Just not getting my hopes up… It comes when it comes.
At least all the issues and bugs they have identified and have been having will be fixed when they do ship!
Batch 16, and I have a DYI version and am bringing a Samsung 980 Pro 1TB. Also this is replacing an older Asus 2080 TI gaming laptop that has soldered dual fans for the CPU and GPU. I tired to replace the GPU one and fried the motherboard, got it repaired under warranty. And 2 years later the CPU fan died and I can’t boot it without clipping the wires to the fan. Also this is weird shaped fan so, I an going fully reparable this time. For now my hubby lives with a steam deck oled, and wants his game laptop back.
I still have my gaming desktop…so here is hoping this comes soon.
Configuration:
- Ryzen 9 7940HS
- Memory: DDR5-5600 - 64GB (2 x 32GB)
Expansion Bay System
- Expansion Bay Module: Graphics Module (AMD Radeon™ RX 7700S)
Customization
- Spacer: Color shift
- Spacer: Color shift
- Laptop Bezel: Framework Laptop 16 Bezel - Black
- Keyboard: US English
- Power Adapter Region: US / CA
Expansion Cards
- 3 x USB-A
- 3 x USB-C
Accessories
- LTT Noctua Edition Screwdriver
LTT Screwdriver - Noctua Edition – LTTStore
Very excited for this! DIY version here. Hoping it comes before EMFcamp so I can take it along, but if not, no big deal. I decided to go high end for the processor but leave out the graphics module for now for budget reasons - I can always add the graphics module on later, which is awesome!
Configuration:
- Processor: Ryzen 9 9740HS
- Storage: WD_BLACK SN770 NVMe - M.2 2280 - 1TB
- Memory: DDR5-5600 - 32GB (2 x 16GB)
Expansion Bay System:
- Expansion bay shell
Customisation:
- 2x Spacer: Lavender
- Keyboard: British English
- Laptop Bezel: Lavender
- Power Adapter: UK/IE/HK/SG
Expansion Cards:
- Ethernet
- HDMI
- 2x USB-A
- 2x USB-C
Just a note about this… They never updated the quarter placeholders after the delays. Mine (Batch 4) still showed Late Q4 2023 before it shipped.
They’ve also stated that they should have all preorders shipped by the end of Q2 2024.
Yes there is…My profile name is Mary but everyone calls me Jenny.
I thought I read some where they had opened a new assembly plant. Wouldn’t that speed things up a little?
I’m just hoping that mine gets here before this HP piece of junk dies on me. But then I know that the longer I wait the more bugs they will find and fix.
I would also think that maybe if you order the DIY they should ship faster because they don’t have to be
assembled. Some times you can almost justify almost anything! Or at least I can. It helps me with the waiting process.
Mine’s a DIY
Configuration
System: Ryzen™ 9 7940HS
Memory: DDR5-5600 - 16GB (1 x 16GB)
Remove Memory
Operating System: Windows 11 Home (Download)
Remove Operating System
Storage: WD_BLACK™ SN850X NVMe™- M.2 2280 - 2TB
Remove Primary Storage
Expansion Bay System
Expansion Bay Module: Expansion Bay Shell
Customization
Laptop Bezel: Framework Laptop 16 Bezel - Black
Power Adapter Region: US / CA
Spacer: Black
Spacer: Black
Keyboard: US English
Expansion Cards
Audio
MicroSD
DisplayPort (2nd Gen)
Ethernet
HDMI (3rd Gen)
2 x USB-A
3 x USB-C
But I goofed up. I thought I ordered Graphic Module AMD Radeon Rx 7700S and 2x DDR5-5600 but looking back on my order I see I didn’t. Does anyone know how I can update my order?
When I ordered mine on 1/30 I thought it said Q2 end of April so that was when I started to make my plan as to how fast I had to save the dollars.
I just pulled up my order and it still says Q2 then I decided to see what Q someone ordering today would be in and saw this
Batch 18 Sold Out
Batch 19 Ships Q2
So ours shouldn’t be to far off!!! I can hardly wait!!!
I don’t see any options (apart from remove os) I’d just email support and ask them
Thank you for the info. I think I’ve gotten it worked out by just keeping the shell because I know down the road I’ll need it and then ordering the Graphics Module (AMD Radeon™ RX 7700S) when it’s back in stock on the Market Place. I sure don’t want to do ANYTHING to drop off Batch 16.
Configuration
System: Ryzen™ 7 7840HS
Memory: DDR5-5600 - 32GB (2 x 16GB)
Expansion Bay Module: Graphics Module (AMD Radeon™ RX 7700S)
Customization
Keyboard: US English
Laptop Bezel: Framework Laptop 16 Bezel - Black
Power Adapter Region: US / CA
Numpad: Numpad Module
Expansion Cards
2 x USB-C
2 x USB-A
HDMI (3rd Gen)
Ethernet
Audio
and planning to buy storage and get windows separately
I could see heads up emails as early as mid may if things keep getting quicker as they go through the batches.