Same for me as Richard3 -Ordered 5/07, same original email of Q3, account order status says ships “late Q3” still.
Batch 3 Ryzen 7 kit here, ordered 5/13 and still seeing Late Q3 as well
Framework sent me an email stating some delays (my post on this thread was pre-ordering a mainboard using the Ryzen 7040 series for a DIY):
Update on Framework Laptop 13 (Ryzen 7040 Series) shipment timing
Unfortunately, due to electrical issues we recently found during validation along with late firmware delivery from our silicon vendors, we’ve had to delay the start of mass production for Framework Laptop 13 (Ryzen 7040 Series) until September. We’ll be shipping as many pre-orders as we can before the end of September, but we anticipate that many orders originally in Q3 batches will need to move into Q4. We have prepared substantial production capacity, so we don’t expect the late start to cascade into delays in later batches.
—- I only shared the main paragraph ——
Funny. Yesterday it said “Q4” in my user account. Today it’s back to Q3.
I think we will see. In any case, I’m looking forward to it. Feels a bit like waiting for Christmas when I was a kid
For me I do not any quarter reference (to my order). The pre-order is marked as Batch 3.
If you select “view order” you should be able to see the something like “Digital Delivery Batch 3 - Ships Late Q3” top right of the screen
Thanks for pointing out that there is more detail near the top as I missed it.
My order has this at the top: Free Shipping Batch 3 - Ships Late Q3
Digital Delivery has normally referred to items like Windows OS. I do not have any digital words denoted within my order.
Has anyone gotten any updated guidance on ship dates? I’m still sitting at late Q3…
I am reminded of a kids song.
“She’ll be coming round the mountain when she comes.”
It’s hard to be patient I know.
I ordered a batch 1 11th Gen on the first day, and it was not delivered until the beginning of August.
Approximately 84 days.
Still using it, no major issues, minor software and configuration on Linux, user fixable after research.
I am assuming everyone got a similar email with the subject:“Third update on Framework Laptop 13 (Ryzen 7040 Series) shipment timing”.
It seems there are issues with ‘Back left and Back right’ ports on the mainboard that are needing to be resolved.
I didn’t and I’m batch 2, when did it come?
6.9.2023, basically the same as the mail before:
" Third update on Framework Laptop 13 (Ryzen 7040 Series) shipment timing
We’re getting closer to ramping up mass production of Framework Laptop 13 (Ryzen 7040 Series), and we want to keep you up to date on the progress. In the first email we sent, we shared that we needed to extend the development schedule and delay the first shipment timing to resolve late issues we found, and in the second email we stated that progress was good. We’re relieved to state that development and validation continue to go smoothly. We’ve gotten additional engineering support and issue resolution from AMD and Infineon, and the latest internal firmware release candidates are stable. There are still a handful of USB-PD items and difficult-to-reproduce issues we’re working through, but we feel confident in holding the mid-September production start date we shared earlier. In addition to our Supply Chain team members who are there regularly, we’ll have several members of the Framework engineering team on-site at the factory over the next couple of weeks to ensure things go smoothly.
Expansion Card behavior
As a reminder, we’ve found that the USB4 retimers from Kandou that we use on the back two Expansion Card slots are unable to enter low states automatically with USB-A, HDMI or DP Expansion Cards. We’re continuing to work through potential USB-PD firmware solutions to address HDMI and DP Expansion Cards, though these may come in a post-launch firmware update. The compatibility table remains the same as our last update for now:
Installing Windows on DIY Edition
To resolve the missing network drivers for RZ616 in the Windows 11 installer, we’ve written a guide that uses Rufus to bypass the network requirement. We’ll be publishing this shortly before we start shipping.
Installing Linux
Linux usability and stability continues to improve. We expect that Fedora 38 will largely work out of the box, while Ubuntu LTS will require manually updating to a more recent kernel for now."
Oh, I got something mixed up and thought there was a newer one thanks!
Ubuntu 22.04.3 LTS is now available. I wonder if that has a new enough kernel that it will be good to go without a further update.
I think there is an update on the link below about the back two ports, looks like the issues with HDMI and micro SD have been sorted.
The included kernel in 22.04.3 is 6.2, and 6.3 added some AMD CPU branching stuff, but I couldn’t find whether that will be relevant for the 7040 series. Might be, might not be.
Pure speculation: if it is relevant, an upgrade to kernel v6.3 could see a significant performance boost
Kernel 6.2 was released in Feb 2023, Ryzen 7040 desktop models start selling in Aug 2022, laptop models available to OEMs in late Apr 2023 or so (sources are unclear). Initial CPU support usually goes into the kernel before the physical CPUs hit the market, but still, I expect this’ll be hit and miss.
I’ve said it before and I’ll say it again: if you want or (as in this case) need new stuff, LTS releases are not your friend. They are simply not made with you in mind. Their target audience is people with boxes in inaccessible closets or distant datacenters, or IT departments managing unattended updates on hundreds of machines. They love their LTS, but they are not you (even when you are one of them buying yourself a Framework).
Why Framework chooses to only have an LTS as a first-class choice is probably a mix of being IT-department-friendly and not having the staff to follow any Linux distro that’s actually consumer-targeted (except apparently Fedora?..). Which is a fine tradeoff for me, for example, — I know I’m not buying the best experience available for the money in the short term, in exchange for it being better in other respects — but it still shouldn’t create the impression that an LTS is the best idea for the home user.
(This post brought to you by two days spent remotely debugging an LTS-using friend’s obscure LaTeX internationalization issue caused by a bug that was fixed in early 2019.)
@Philip_Bell, Thank you for denoting the update. I am a little behind on emails (on this topic), but I am trying to catch up this week.
To those unaware of the blog:
"## Production update on Framework Laptop 13 (AMD Ryzen 7040 Series)
We continue to be on track to start shipments before the end of the month on the new Framework Laptop 13 (AMD Ryzen 7040 Series). Last week we shared that SMT (Mainboard production) had started, and this week we’ve begun final assembly of laptops. We also pulled some early units to send out to press reviewers to make sure that you can see exactly where we’ve landed on performance and battery life. We have another happy bit of news to share with you: our Lead System Architect Kieran was able to implement a firmware solution to reduce power consumption when using HDMI and DP Expansion Cards on the back two slots. The only remaining power issue is with USB-A Expansion Cards on the back slots, which we are investigating a future USB-A Expansion Card hardware revision to resolve."
As today is the 28 of September as there are only a few more business days before the end of Quarter 3 (using a normal yearly calendar Jan 1 to Dec 31), I am still hopeful there would be an update to the order status.
Mine still states ‘Free Shipping Batch 3 - Ships Late Q3’
It would be nice, as I am still hopeful, to get a notification on or before the 30th of September regarding the order status, etc.