J/K, but not really J/K…
Batch 6
Build:
- Ryzen™ 7 7840HS - Radeon™ RX 7700S - 180W.
- Lavender bezel
- International English Linux Keyboard
- Power adapter
- RGB Macropad
- More modules
Status:
March 19 5:45p - We’re preparing your batch
Batch 5
- Ryzen 7 7840HS
- Gpu
- Power adapter
- Ram 32 2x16
- Primary SSD 1 TB
- Keyboard international English: Linux
- Bezel black
- Spacers black
Batch 6
- DIY
- Ryzen 7
- No GPU, OS, RAM OR SSD
- US English Keyboard
- Numpad Module
Status:
- Mar 19th - Preparing Batch
Batch 6
- DIY
- Ryzen 7
- No OS, RAM or SSD
- US English kb
- Lavendar spacers and bezel
- Power adapter
Preparing batch on March 19.
Edit: charged on March 25 (4 business days later, 6 calendar days later)
Edit 2: by March 27 it had taken off from Taiwan, and after being in Anchorage for barely enough time to get cold, it’s landed in Indianapolis around 2:15am on the 28th.
Edit 3: By March 28, around 10am local time US/Eastern, the package had arrived at the local distribution center and it’s now taken its last hop and is out for delivery
Batch 5
Shipped March 20th 2:07 pm Taiwan time.
Batch 5
- System: Ryzen™ 9 7940HS
- Expansion Bay Module: Graphics Module (AMD Radeon™ RX 7700S)
- Power Adapter Region: US / CA
- Macropad: RGB Macropad Module
- Keyboard: US English
- Expansion Bay: Expansion Bay Shell
(BYOD):
- G.Skill 64GB Ram
- System SSD WD SN770M 1TB
- Code SSD Samsung 990 PRO 2TB
Ordered: 2023-07-18
Preparing Email: 2024-03-14 12:21
Charged (not-settled): 2024-03-19
Order Shipped Email: 2024-03-20 04:05
FedEx Picked up (TAOYUAN TW): 2024-03-20 01:48 (CDT)
(Estimated delivery to St. Louis, MO, USA): 2024-03-22 (before noon)
DELIVERED : 2024-03-21 11:41
1 day earlier than expected.
If I did my math on dates right, almost 80% of my wait is over.
Batch 5:
- announced on 2024-03-14
- charged on 2024-03-18
- shipped on 2024-03-19
- arrived on 2024-03-21
When were you charged?
* Small edit to say/clarify that these are my dates *
- Charged on 2024-03-18
- Shipped 2024-03-20
- Scheduled to arrive 2024-03-25
Delivered: 2024-03-21 11:41
Does you spreadsheet have multiple batch numbers or just batch 6 and batch 12?
If there are other batches or a way to estimate the batch numbers, could you share a link or a file to the spreadsheet?
I really like the idea of the wait % complete and would like to check how long I’ll have to wait before my laptop arrives.
I can find a spot to share. The file is in .ods LibreOffice spreadsheet. If that is not OK I can save a copy in .xls.
Todays numbers.
An xls file or a Google sheet would be better. Thanks!
I’m sure you’ll be able to open a simple .ods with most programs
hopefully, this is a link to the spreadsheet.
I took the liberty of “internationalising” the dates and then extrapolating the spreadsheet to cover the batches 7-12. Easily extended further if anyone wants that.
PS converted back to ODS
Batch | ||||||||
---|---|---|---|---|---|---|---|---|
FW Starts Shipping | Batch 6 Notify | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
26 Jan | 19 Mar | 53 | 62 | 71 | 80 | 88 | 97 | 106 |
Projected date | Projected date | Projected date | Projected date | Projected date | Projected date | |||
27 Mar | 05 Apr | 14 Apr | 23 Apr | 02 May | 11 May |
Ah, right. On the 18th. Edited the post to reflect that.
Nice.
Mine was made just for my case. There is perhaps some value to those in other batches.